The original DCR contents is replaced by the following: Paragraphs: See attached Draft 4C with changes to Paras: 4.1, 7.3.2.1, 7.3.2.4, 7.3.2.5, new 7.3.2.6, 7.3.2.7, 8.1, 8.10.2, new 8.10.4, Chart I
Proposed wording: See attached Draft 4C (yellow and blue highlights for changes).
Justification: As concluded by PSWG#94 review of this DCR1377:
The existing Temperature & Power Step-Stress tests are effectively made optional based on technology (subject to Manufacturer & ESCC Executive review).
Also based on technology: The addition of an optional 10000 cycles intermittent operating life test to the step-stress testing subgroup per MIL-19500 requirements, also subject to Manufacturer and ESCC Executive review.
………………..
|