The updated Generic Specification 3008 Issue 4 Draft I includes various changes to the initial 3008 Draft 4C. Many of the changes included in Drafts 4D to 4I were minor editorial changes and are therefore not listed here.

The additional technical changes included in Drafts 4D to 4I are given below (N.B. These changes have all been discussed and agreed during PSWG reviews and PSWG meetings, notably PSWG#97 & PSWG#98):

- Qualification, Periodic Testing and Lot Validation Testing is modified: There are separate Charts F4A for hermetically sealed components and F4B for non-hermetic; The testing sequences have been re-arranged for Subgroups 1A, 1B;
Shock test added to Subgroup 1B (required to be performed immediately prior to Vibration); 'Corrosion' test is deleted; Subgroup 1C is only required for Qualification Testing / Periodic Testing for renewal of qual. after lapse.