|
|
|
|
|
|
|
|
|
|
|
Based on the review performed by the PSWG adhoc WG on ceramic capacitor generic specification as implemented into ESCC3001 issue 2, the following modifications shall apply to this DCR:
a) All changes, including these modifications, have been implemented in the new DCR attachment 3001/038 draft 2D (which shall replace the DCR attachment 3001/038 draft 2C).
b) Ref. original DCR item 1) General: The following additional editorial and technical amendments resulting from the changes made to the test requirements of the Generic Specification No. 3001, shall apply: • Table 6: Climatic Test Sequence requirements are deleted. • Table 6: Damp Heat Steady State is deleted and replaced by Steady State Humidity (85/85) test requirements. Note - the Voltage Proof (Body Insulation) test, added by the original DCR, is not required for Steady State Humidity test. • Table 6: Add notes applicable to Operating Life, to explain when the 1000h & 2000h measurements apply.
c) Ref. original DCR item 6) Table 2 & 6: units Gohm.nF are used for Insulation Resistance (instead of sec).
d) Ref. original DCR item 7): The required ambient temperatures are added to the Temperature Characteristic conditions.
e) 3001/037 draft 2C, Para. 2.1.1.1(a): The deviation “Resistance to Soldering Heat shall be performed prior to Robustness of Terminations” is deleted (as Chart F4 of the current Generic Specification does not include Robustness of Terminations.
Note that the Manufacturer’s name has changed since this DCR was originally raised (now Exxelia Technologies). Appendix A amended accordingly.
|
|
|