Amend and replace each item a) in the original DCR585 text for each specification,
ESCC 20100 Para 5.1, ESCC24300 Para 9.1 and ESCC25400 Para 11.1, as follows:
ESCC 20100 Para 5.1
a) He will perform any actions arising from the subsequent evaluation and
qualification phases, which are considered necessary by the ESCC Executive for the
proper qualification of the component, subject to the ESCC Executive providing the
Manufacturer with a full justification.
ESCC24300 Para 9.1
a) He will perform any actions arising from the subsequent evaluation and capability
approval testing phases, which are considered necessary by the ESCC Executive for
the proper capability approval of the capability domain, subject to the ESCC
Executive providing the Manufacturer with a full justification.
ESCC25400 Para 11.1
a) He will perform any actions arising from the subsequent evaluation, certification
and qualification phases, which are considered necessary by the ESCC Executive for
the proper qualification of a technology flow, subject to the ESCC Executive
providing the Manufacturer with a full justification.






Changes

Optimized for:

© 2010 European Space Agency. All rights reserved.