Para. 1.7: The functional diagram is modified (polarised capacitor with additional "-", for full clarification)

Para. 2.4.2, Note 1: The sample size is 6 pieces (was 5)

A new Appendix, "Appendix 'A' Agreed Deviations for Exxelia Technologies", is added to list various agreed and required deviations against Chart F3 & F4, i.e.:

* All lots, prior to the performance of High and Low Temperatures Electrical Measurements, shall be serialised 100%;

* The Voltage application time (part of Voltage Proof during initial Room Temperature Electrical Measurements) shall be the standard 60 (+0 -1)s. 5s is specified for all other voltage proof measurements required during Charts F3 & F4;

* The Temperature Coefficient measurements (High and Low Temperatures Electrical Measurements, Chart F3) shall be R+R in order that this data may be used in lieu of performing this test again per Subgroup 2B of Chart F4;

* 100% X-ray shall be carried out at the end of Screening prior to External Visual inspection.







Changes

Optimized for:

© 2010 European Space Agency. All rights reserved.